Sunday, 4 March 2012

Filming

So after a long week of planning and organising me and Amir began our filming process this Friday and Saturday. We managed to get at least 90% of the footage needed that day with the other 10% to be completed in sixth form on Monday. Me and Amir are already editing the clips and footage we have and have reviewed each piece to say whats good, whats bad and what needs adding. On Friday everything went our way from weather to actors and using Amir's really good idea of using his mums car with the tripod in so that we could get a smooth tracking shot which looks amazing (link below)

http://vimeo.com/37882502

On Saturday we were abit worried as in the early hours of the day and early hours of the afternoon it was raining, even though it had stopped i knew that we still couldn't film as the ground was still wet meaning continuity would be ruined if we had filmed. But to our luck the sun came and dried the ground and me and Amir with hesitation arranged to meet up and film the rest of the sequence.

All of the filming went great and we managed to get everything we needed that day for the sequence, i just hope everything goes to plan on Monday so we can finish the film and use the rest of the four days for solid editing; during this time i will be looking at creating film posters, magazine covers, logo's and franchise to help with presenting our film in the evaluation stage.

No comments:

Post a Comment